Project Overview:

Project Name: Deloitte Terrace Signage Installation
Location: EcoWorld 4D, Bellandur, Bengaluru
Client: Deloitte
Executed By: AD World Signages Pvt. Ltd.
Collaborators: JLL & Deloitte Project Teams

AD World Signages was entrusted with the prestigious task of installing the Deloitte brand signage at EcoWorld 4D, Bengaluru—a key sky signage export-level project. The execution required high-altitude expertise, precision engineering, and a strong focus on safety. This project is a testament to our ability to deliver export-quality sky signage solutions at national and international standards.

Scope of Work – Sky Signage Installation

  • Detailed site analysis and planning
  • Safety protocol formulation and execution
  • Structural steel fabrication and erection
  • Signage fabrication and installation
  • Electrical wiring and panel setup
  • Surface painting and post-installation cleanup

The comprehensive scope included everything from initial assessment to final handover—executed seamlessly under stringent safety and quality parameters.

Site visit & Planning for Safe work Execution with JLL team.

  • Joint inspections with JLL Safety and AD World Safety Team.
  • Preparation of Standard Operating Procedures (SOPs)
  • Scaffolding and lifeline layout planning
  • Mock ups for ingress points

Safety planning was at the heart of this project. From the beginning, we worked closely with JLL teams to ensure all safety measures were properly outlined and approved.

Sky Signage Export Visit2
Sky Signage Export Visit1

SOP as per planning & discussing with JLL Safety team.

  • Drilling anchor bolts into terrace structure
  • Fixing life-line ropes and harness points
  • Ensuring team members followed PPE protocols
  • Installation of man-catching safety nets

Every team member underwent safety briefing and was fully equipped with high-grade PPEs. We installed life-lines and anchor points before initiating the elevation work.

Sky Signage Export Design1
Sky Signage Export Design2
Sky Signage Exports Design3
Drilling anchor bolts to install life-line rope.
  • Harness Hooked to the existing anchors and Drilling safely.
  • After Installation of Life-line as per SOP.
Sky Signage Design1
Sky Signage Design2
Scaffolding, Net, Ingress & Egress installation as per SOP.
  • Customized scaffolding to fit terrace conditions
  • Interlocking scaffolds with the parapet wall
  • Access/egress pathways marked clearly

Secure scaffolding was essential for work at such heights. We implemented controlled ingress/egress paths in accordance with SOPs.

Scaffolding1
Scaffolding2
Posters for safety awareness & PPE.
  • Safety posters and instruction boards at site
  • Daily toolbox talks and worker briefings
  • PPE reminders and visual cues for safety

Creating awareness was as important as implementing safety. Our daily briefings and constant monitoring ensured 100% compliance throughout.

PPC1
PPC2

Scaffolding shifting & MS material cutting, shifting to terrace.

  • Material transfer through service lifts
  • Floor protection ensured during shifting
  • MS materials cut precisely as per structural requirements

All materials were handled with care to prevent damage to the building interiors and ensure efficient installation on-site.

Meterial Handiling3
Meterial Handiling2
Material Handling1

Drilling Nut-Bolts & fixing with bolt Solution & fixing baseplates.

  • Precision drilling for anchor points
  • Use of bolt solution to ensure grip
  • Alignment of baseplates with laser markers

Accurate baseplate positioning laid the foundation for safe and sturdy structural fabrication.

Drilling Nut-Bolts1
Drilling Nut-Bolts2
Drilling Nut-Bolts3
MS tubes cutting and structure & frame fabrication & erection.
  • On-site tube cutting and welding
  • Fire blankets used to avoid floor damage
  • Structure erected with alignment tools and PPE usage

Each structural element was fabricated and assembled on-site, ensuring full alignment and adherence to safety standards.

MS tubes cutting1
MS tubes fixing1
MS tubes Fixing2

Double coat primer & Silver grey painting.

  • Anti-rust primer applied in two coats
  • Aesthetic topcoat in silver grey for longevity and brand consistency

Our paint application not only met aesthetic standards but also ensured long-term durability against weather exposure.

Double coat primer Work1
Double coat primer Work2
Double coat primer Work3
Signage back & front Letter installation.
  • Mounting of individual channel letters from the rear
  • Secure fixing using industrial-grade bolts and screws
  • Alignment checks conducted post-installation

The signage was installed letter by letter, carefully aligned and securely fastened to the structural base.

Signage back1
Signage back2
Signage back3
Signage back4
Signage Front image
Electrical connection, DB & tray installation.
  • Internal wiring for LED lighting
  • DB board and cable tray setup
  • Final testing of illumination and control systems

The electrical system was integrated to ensure optimal night-time visibility while maintaining safety standards.

Electrical connection1
Electrical connection2
Electrical connection3
Signage Letters Touch-up & final painting.
  • Letter alignment verified with visual and laser tools
  • Minor paint touch-ups done for a flawless finish

We conducted a final inspection for aesthetics and functionality before concluding the installation process.

Signage Letters Touch-up
Signage Letters Touch-up 2
Removing scaffolding, Man-catching Net & Lifeline rope.
  • Safe dismantling of scaffolding and safety nets
  • Controlled lowering of tools and equipment using rope methods
  • Post-work cleaning to leave no debris or damage

We ensured the site was returned in pristine condition post-installation, with zero damage and full client satisfaction.

Removing scaffolding2
Removing scaffolding3
Housekeeping and Final picture of site.
Housekeeping and Final picture of site.
Housekeeping and Final picture of site.2
Housekeeping and Final picture of site.3
Housekeeping and Final picture of site.4
Final pictures of Signage.
  • Final walkthrough with JLL and client
  • Hand-over with installation and safety report
  • Zero accident achievement
  • Special thanks to Deloitte and JLL Safety Teams

The project was a success story of collaboration, commitment, and adherence to safety—delivered on time and with zero incidents.

Deloitte Sky Signage Export Photo1
Sky Signage Export Image2
Sky Signage Export Night View Image1
Sky Signage Export Image4

Sky signage is installed on the highest points of buildings and is engineered for visibility, safety, and durability under extreme weather conditions.

Typically 3 to 6 weeks depending on design complexity, approvals, and building height

Yes. With structural engineering and safety certifications, it is completely safe and long-lasting.

High-quality LED modules used by AD World are IP-rated and weatherproof, designed for heavy rain and heat.

Their 25+ years of experience, expert team, and in-house capabilities make them a trusted choice for premium signage solutions.